Learn more about this property online at:
https://www.collierscanada.com/p-can2011666
https://www.collierscanada.com/p-can2011666
- For Lease
Build-to-Suit or Lease
68th Street Logistics Park is a 2.2 million square foot logistics park located in Southeast Calgary, the city’s largest industrial submarket. It provides excellent access to major transportation routes, being adjacent to Glenmore Trail and the Stoney Trail ring road connecting to other major routes such as Highway 2 (Deerfoot Trail). The park is in close proximity to the recently upgraded Canadian Pacific (CP) Rail intermodal terminal. It benefits from a newly twinned major 4-lane access road (68 Street) that connects to Glenmore Trail via a new at-grade lighted intersection. The park is also located close to large residential areas providing good access to labor and a transit system that runs directly through the site.
Building 1 has primary exposure to 68th Street SE, incorporating excellent access and egress for trucks in addition to separated customer and employee parking. It is being constructed to be LEED certified with high-quality building features, including high dock door counts, grade loading flexibility, and 36’ clear height. It will be completed in Q4 2023.
Building 2 is designed for mid to large bay users with a focus on high dock door counts, efficient storage space with 40’ clear height, and trailer parking. It has separated truck and passenger vehicle entrances, with a focus on efficient counter-clockwise truck circulation. The building is being built with high-quality construction specifications and will be completed in Q4 2023.
Building 1 has primary exposure to 68th Street SE, incorporating excellent access and egress for trucks in addition to separated customer and employee parking. It is being constructed to be LEED certified with high-quality building features, including high dock door counts, grade loading flexibility, and 36’ clear height. It will be completed in Q4 2023.
Building 2 is designed for mid to large bay users with a focus on high dock door counts, efficient storage space with 40’ clear height, and trailer parking. It has separated truck and passenger vehicle entrances, with a focus on efficient counter-clockwise truck circulation. The building is being built with high-quality construction specifications and will be completed in Q4 2023.